Our visit to Star of Hope has defined a more focused pilot: two dedicated systems, a combined daily water requirement of 15,000 litres and a clear next step in testing.

Mukuru, Nairobi Smart X EcosystemKenya Red Cross Society
The visiting team at Star of Hope school in Mukuru, Nairobi
The visiting team at Star of Hope school in Mukuru, Nairobi.

Our recent visit to STAR OF HOPE school in Mukuru, Nairobi, has clarified the next phase of the HydroCharge pilot. The school wants two separate systems: one for the primary school and one for the junior secondary school.

The primary school requires 10,000 litres per day; the junior secondary school requires 5,000 litres. Together, these give us a defined daily water requirement of 15,000 litres and a clearer basis for designing a compact installation.

Planned daily water supply

Primary school System A
10,000 litres / day
Junior secondary System B
5,000 litres / day

Combined school requirement: 15,000 litres per day. Final system capacity and performance will be verified through testing.

Dedicated to the school

The school has requested its own systems to protect the installations and manage access. The pilot will therefore serve the school, with water collection and distribution within the school grounds. The systems will not be shared with residents outside the school.

Each school section will have its own planned supply. This lets us assess production, servicing and operating requirements separately, while agreeing placement, storage and distribution with the school.

Star of Hope Primary and Junior Secondary School, with pupils in the school grounds
STAR OF HOPE Primary and Junior Secondary School. Photograph from the visit to Mukuru.

A more compact route to the pilot

The revised volumes make a substantially smaller installation possible. A smaller footprint may simplify positioning and support, and could help us move more quickly towards a pilot in everyday school use.

Twenty-inch filters are a possible option, subject to the upcoming test results. Daily water volume alone does not determine filter size: the required flow rate, treatment performance, filter life and replacement requirements must also be established.

The test comes next

Testing will assess how the filters perform after prefiltration and pH adjustment, including the reduction of fluoride and relevant heavy metals. The results will inform the configuration of both systems, installation planning and updated capital and operating cost estimates.

Water quality assessment must cover treatment, storage and distribution. Treated water will only be used once its quality has been verified. The pilot will then document daily delivered volume, water quality at collection points, operational stability and the actual servicing requirements.

The next milestone

Confirm the filter configuration, agree the installation plan with the school and establish the evidence needed for reliable operation. A successful pilot could become a practical reference for other schools, with each new site assessed against its own water source and needs.